Solar Panels
Customer need: quality control and proof-of-concept analysis of a third-party design before going to production of solar panels and innovative supporting structures.
MEC solution: Accepting external design data for analysis, using results and conclusions to advise next phase design changes, and repeating several times until the required level of strength has been reached, preventing the risk of heavy damages.
Customer: Zenith-Solar